Manual Handling Risk Assessment
All fields to be completed .
The following factors will increase the risk potential:
a. The more often a task is carried out.
b. The heavier a load is.
c. The greater the irregularity of the load.
d. The greater the distance the lead is to be carried, lifted or lowered.
e. The greater the extremes of temperature (hot/cold) or sharpness of the load.
f. The physical abilities of the individual.
Assessment Form
You can add more hazards by checking the 'Add Another Hazard' box at the bottom of the form
Hazard ref: 1
Hazard:
Persons at risk:
Control measures:
Initial Risk:
Likelihood:
Severity:
Risk Level:
Residual Risk:
Likelihood:
Severity:
Risk Level:
Further Action Required?:
Due (date):
Hazard ref: 2
Hazard:
Persons at risk:
Control measures:
Initial Risk:
Likelihood:
Severity:
Risk Level:
Further Action Required?:
Residual Risk:
Likelihood:
Severity:
Risk Level:
Due (date):
+ Add: Add another Hazard
Hazard ref: 4
Hazard:
Persons at risk:
Control measures:
Initial Risk:
Likelihood:
Severity:
Risk Level:
Further Action Required?:
Residual Risk:
Likelihood:
Severity:
Risk Level:
Due (date):
+ Add: Add another Hazard
Hazard ref: 5
Hazard:
Persons at risk:
Control measures:
Initial Risk:
Likelihood:
Severity:
Risk Level:
Further Action Required?:
Residual Risk:
Likelihood:
Severity:
Risk Level:
Due (date):
+ Add: Add another Hazard
Hazard ref: 6
Hazard:
Persons at risk:
Control measures:
Initial Risk:
Likelihood:
Severity:
Risk Level:
Further Action Required?:
Residual Risk:
Likelihood:
Severity:
Risk Level:
Due (date):
+ Add: Add another Hazard
Hazard ref: 7
Hazard:
Persons at risk:
Control measures:
Initial Risk:
Likelihood:
Severity:
Risk Level:
Further Action Required?:
Residual Risk:
Likelihood:
Severity:
Risk Level:
Due (date):
+ Add: Add another Hazard
Hazard ref: 8
Hazard:
Persons at risk:
Control measures:
Initial Risk:
Likelihood:
Severity:
Risk Level:
Further Action Required?:
Residual Risk:
Likelihood:
Severity:
Risk Level:
Due (date):
+ Add: Add another Hazard
Hazard ref: 9
Hazard:
Persons at risk:
Control measures:
Initial Risk:
Likelihood:
Severity:
Risk Level:
Further Action Required?:
Residual Risk:
Likelihood:
Severity:
Risk Level:
Due (date):
+ Add: Add another Hazard
Hazard ref: 10
Hazard:
Persons at risk:
Control measures:
Initial Risk:
Likelihood:
Severity:
Risk Level:
Further Action Required?:
Residual Risk:
Likelihood:
Severity:
Risk Level:
Due (date):
+ Add: Add another Hazard
Hazard ref: 11
Hazard:
Persons at risk:
Control measures:
Initial Risk:
Likelihood:
Severity:
Risk Level:
Further Action Required?:
Residual Risk:
Likelihood:
Severity:
Risk Level:
Due (date):
+ Add: Add another Hazard